Photo Album
-
Time to Get Serious
-
Stripped and Bundled
Packaged for removal with extraneous parts removed.
-
Jig Used to Balance Engine During Lift
-
Old Beds Prior to Cutting
Hole in bulkhead facilitates removal of shaft.
-
Beds after Cutback
Ground pads to right are for placement of wooden extensions.
-
Cutting the Compound Angles for Bed Extensions
Note styrofoam mockup on left. Blocks are treated 2x4s screwed together
-
Dust Encllosure to Contain Grinding Dust
Quite frankly, it didn't really work! Several days were needed to clean dust out of cabin.
-
Coming Up for Air
Grinding in a confined space is not the best part of this job.
-
Checking Alignment with Engine Template
A laser was used to sight down the shaft log.
-
Attaching Bed Extensions to Hull
Epoxy and several layers of glass.
|