Home
The Crew
Windwalker
Trips
Florida to Maine 2006
Bahamas 2013
Bahamas 2015
Bahamas 2017
East Coast and Caribbean, 2002-3
Voyage 1 – East Coast and Caribbean 1999-00
Bahamas 2019
Projects
Repower – 2008
Contact
Windwalker Projects
Repower - 2008
Repower - 2008
Overview
Step by Step
Photos
Project Costs
Resources
Photo Album
Preparation
Engine Arrival
Design
Haulout
Engine Swap
Final Install
Finishing Touches
Drilling Mounting Holes for Rails
Aluminum angle stock will be bolted to the beds with 1/2" bolts.
New Beds
Glassed and primed.
Engine Packaged for Transport
Transmission is in wrapped package.
New Paint for Walls and Bilge
Waiting for the Crane to Arrive
Setup for Engine Swap
Chainfall was used for moving engines in and out of the cabin after crane swings over cockpit.
Out with the Old
Drop it Here Now
In with the New
Down the Hatch
Chainfall made easy work of the 1" of clearance through the hatch.
Ready for Mounting
This jQuery slider was created with the free
EasyRotator for WordPress
plugin from DWUser.com.
OK
Rotator powered by
EasyRotator for WordPress
, a free and easy jQuery slider builder from DWUser.com. Please enable JavaScript to view.