Home
The Crew
Windwalker
Trips
Florida to Maine 2006
Bahamas 2013
Bahamas 2015
Bahamas 2017
East Coast and Caribbean, 2002-3
Voyage 1 – East Coast and Caribbean 1999-00
Bahamas 2019
Projects
Repower – 2008
Contact
Windwalker Projects
Repower - 2008
Repower - 2008
Overview
Step by Step
Photos
Project Costs
Resources
Photo Album
Preparation
Engine Arrival
Design
Haulout
Engine Swap
Final Install
Finishing Touches
Finished Rails
Ready for engine.
Coaxing into Position
Chainfall attached to metal bar across hatch and 2x4s to slide on.
Settled on the Rails
Holes weren't drilled until transmission installed and shaft lined up.
Aligned and Bolted Down
Making the Exhaust Transition
Coupling is pre-fab glass tube with additional glass wraps on one end.
Re-pitched Maxprop
Changed from left-hand 26 degrees to a flat right-hand 18 degrees to accomodate faster shaft speed.
Finished All Engine Hookups
This jQuery slider was created with the free
EasyRotator for WordPress
plugin from DWUser.com.
OK
Rotator powered by
EasyRotator for WordPress
, a free and easy jQuery slider builder from DWUser.com. Please enable JavaScript to view.